Snow still lingers on the earth as steel gets tirelessly erected. We’re almost ready for enclosure.

As this is a learning in progress, I’ve missed a few things from the previous test that I’ve improved upon in this one. Namely the missing column in the lower level to support the steel column!

Standard
test

site series // a test 008

20180901_unitsketch_05_edit

a test 008 –
1 UNIT: space under construction
OCCUPANCY: n/a
TYPE(s): architecture, new building
AR/TIFACT(s): 03

A new vehicle has entered the scene. It was at work in the background before while the CAT was busy clearing and moving dirt. Concrete’s almost complete. The calm before the storm that is Steel to arrive on site.

 

Standard
test

site series // a test 007

20180901_unitsketch_05_edit

a test 007 –
1 UNIT: space under construction
OCCUPANCY: n/a
TYPE(s): architecture, new building
AR/TIFACT(s): 02

The Cat’s still around busy backfilling the foundation. Slab on grade is in place. Suspended slab formwork is in progress, and the main level peri system formwork boards are getting craned in.

Sitework is progressing way ahead of my tests, but we’re making headway finally! I went to a mini lecture recently where Bjarke Ingels came to Toronto to talk about the new development going up on King West. There is a plan in place to interject my site series with a test from there. Not sure how the numbering will solve itself yet.

Did you see the new ipad pro? The forever question of do I need it vs do I want it.